I am never too busy for any matching projects

Philip Yaghmai - Project Engineer

These projects required the following:

1. Inspect locations

2. Study overhead material handling need for each machine.

3. Make conceptual design for each area

4. Discuss and finalize conceptual design

5. Make final dimensional design

6. Meet with clients and finalize dimensions and products

7. Order material

8. Discuss installation with various vendors; i.e. mechanical installers, electricians, manufacturing departments, plant management, etc.

9. Make installation schedule

10. Implement each phase and receive approvals

 

 Note: Project required linear and rotational transfer stations from monorails to cranes and visa versa.

One Plant was a large Printing operation, and the second a Polyurethane foam manufacturing shop.

Home

Overhead Mtr Handling

Home

Overhead Mtr Handling

BEY International LLC

Philip Yaghmai

1725 Loma Ave. #15

Long Beach,

California,

90804

Phone: 562-544-3923

Fax: 562-719-2692

E-mail: pyag@msn.com

E-mail: philip@projectengineer.com